A disadvantage of automation is that it tends to increase variable costs for repetitive operational tasks.

A) True
B) False

Correct Answer

verifed

verified

For output to equal projected demand,what should be the actual cycle time for this production line?


A) 54 seconds
B) 27 seconds
C) 20 seconds
D) 18 seconds
E) 14 seconds

F) None of the above
G) C) and D)

Correct Answer

verifed

verified

Which of the following is not true about process design?


A) Process design refers to how production of goods or services occurs.
B) Process design occurs only when new products or services are planned.
C) Process design has strategic significance.
D) Process design has major implications for the layout of facilities.
E) Process design is revisited periodically due to technological changes.

F) B) and E)
G) None of the above

Correct Answer

verifed

verified

Service process design differs from manufacturing in that it outlines the flow of the customer or something belonging to the customer.

A) True
B) False

Correct Answer

verifed

verified

The substitution of human labour with machinery that has sensing and control devices is best described by the term:


A) automation.
B) loss of jobs.
C) computer-aided manufacturing.
D) computer-integrated manufacturing.
E) flexible manufacturing system.

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

A production line is to be designed for a job with three tasks.The task times are 0.5 minutes,1.8 minutes,and 1.1 minutes.If the necessary cycle time is 1.0 minutes per unit,what is the actual minimum number of workstations possible?


A) 1
B) 2
C) 3
D) 4
E) None of the choices are correct.

F) B) and E)
G) None of the above

Correct Answer

verifed

verified

Given the following line balance data: Given the following line balance data:    -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the efficiency for the balance which uses the minimum number of stations? -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the efficiency for the balance which uses the minimum number of stations?

Correct Answer

verifed

verified

For output to equal projected demand,what is the minimum number of workstations needed?


A) 2
B) 2.8
C) 3
D) 4
E) 5

F) All of the above
G) C) and D)

Correct Answer

verifed

verified

If the consultant were to locate departments W,C,L,and E in areas I,II,III,and IV,respectively,what would be total weekly costs?


A) $114
B) $217
C) $255
D) $322
E) $366

F) B) and D)
G) B) and E)

Correct Answer

verifed

verified

Flexible automation consists of high-cost specialized equipment designed for a fixed sequence of operations.

A) True
B) False

Correct Answer

verifed

verified

Repetitive process systems are typically used to produce goods for specific customer orders rather than goods to be held as finished product inventory in anticipation of demand.

A) True
B) False

Correct Answer

verifed

verified

Which one of the following is not one of the steps used in manufacturing layout design?


A) Location of receiving and shipping
B) Presence of customers
C) Special requirements of equipment
D) Allowing space for machines and material handling (e.g. forklifts)
E) All are important factors

F) A) and C)
G) B) and C)

Correct Answer

verifed

verified

What are total weekly costs for the least costly process layout?


A) $114
B) $217
C) $255
D) $322
E) $366

F) B) and E)
G) A) and E)

Correct Answer

verifed

verified

A grocery store would be categorized as a process layout.

A) True
B) False

Correct Answer

verifed

verified

Cellular layouts are like miniature versions of product layouts.

A) True
B) False

Correct Answer

verifed

verified

Process layouts tend to have lower in-process inventories,and higher equipment utilization rates than product layouts.

A) True
B) False

Correct Answer

verifed

verified

Process design is required only when new products or services are planned.

A) True
B) False

Correct Answer

verifed

verified

For output to equal projected demand,what should be the actual cycle time for this assembly line?


A) 0 seconds
B) 3 seconds
C) 9 seconds
D) 10 seconds
E) 28 seconds

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

An advantage of a U-shaped production line is that it facilitates teamwork and flexibility in work assignments.

A) True
B) False

Correct Answer

verifed

verified

N/C machines are best used in cases with all of the following characteristics EXCEPT:


A) mistakes are costly.
B) changes in design are infrequent.
C) parts are processed in small batches.
D) close tolerances are required.
E) all of the choices are characteristics.

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified