Filters
Question type

Study Flashcards

The comprehensive approach used in lean systems to deal with quality includes:


A) designing quality into products and processes.
B) insisting vendors provide high-quality materials.
C) making workers responsible for producing high quality.
D) designing in quality, insisting on quality materials, and making workers responsible for quality.
E) 100 percent inspection of raw materials, work-in-process, and finished goods.

F) None of the above
G) B) and C)

Correct Answer

verifed

verified

Which of the following does not contribute to reduced setup time and cost?


A) standardized setup tools
B) standardized setup equipment
C) custom setup procedures for each product
D) use of multipurpose equipment or attachments
E) use of group technology

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

Lean purchasing requires frequent contract bidding by multiple sources to ensure the buyer of competitive prices.

A) True
B) False

Correct Answer

verifed

verified

The lean philosophy suggests that workers are:


A) assets.
B) liabilities.
C) interchangeable.
D) replaceable.
E) to be phased out.

F) B) and C)
G) D) and E)

Correct Answer

verifed

verified

Setup time and its associated cost can often be reduced by the use of group technology.

A) True
B) False

Correct Answer

verifed

verified

In lean operations, input resources arrive for processing only after the preceding batch has been completed.

A) True
B) False

Correct Answer

verifed

verified

In the lean philosophy, producing more than two order quantities represents waste.

A) True
B) False

Correct Answer

verifed

verified

The four building blocks of lean operations are: product design, process design, personnel/organizational elements, and manufacturing planning and control.

A) True
B) False

Correct Answer

verifed

verified

The lean philosophy recognizes that some work-in-process inventories are a necessary investment to allow for smooth work flow.

A) True
B) False

Correct Answer

verifed

verified

A conveyance __________ signals parts movement.


A) request
B) routing
C) bar code
D) kanban
E) kazian

F) B) and C)
G) A) and B)

Correct Answer

verifed

verified

Limited WIP lowers inventory carrying costs but reduces flexibility.

A) True
B) False

Correct Answer

verifed

verified

Fast and simple are two common threads that run through the four building blocks of lean operations.

A) True
B) False

Correct Answer

verifed

verified

The term that refers to the automatic detection of defects is:


A) kaizen.
B) kanban.
C) autonomation.
D) automation.
E) 100 percent inspection.

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

Although lean systems tend to produce standardized product lines, to provide production variety without accompanying waste, lean producers often use __________ in __________.


A) standardized parts; modular designs
B) jidoka parts; kaizen designs
C) modular parts; flexible designs
D) capable parts; automated designs
E) heijunka parts; kanban designs

F) D) and E)
G) B) and D)

Correct Answer

verifed

verified

Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of:


A) delayed differentiation.
B) kanban.
C) autonomation.
D) andon.
E) matrix management.

F) A) and C)
G) A) and E)

Correct Answer

verifed

verified

"Autonomation" indicates that the firm is attempting to reduce its dependence on automated equipment.

A) True
B) False

Correct Answer

verifed

verified

An operations strategy reflecting the lean philosophy of production should recognize that lean:


A) is most suited for nonrepetitive manufacturing.
B) cannot be implemented sequentially.
C) requires a wholesale commitment from the outset.
D) may provide a competitive advantage.
E) all of the choices.

F) B) and C)
G) C) and E)

Correct Answer

verifed

verified

Preventive maintenance is additional maintenance done immediately after a breakdown has occurred to help prevent any further breakdowns.

A) True
B) False

Correct Answer

verifed

verified

A basic requirement for operating with the low inventories present in lean systems is:


A) Inventory space must be increased.
B) Inventory investment must be increased.
C) Major problems must be identified.
D) Major problems must have been solved.
E) Inventories must be reduced rapidly.

F) B) and E)
G) None of the above

Correct Answer

verifed

verified

In lean operations, a responsibility of the cross-trained worker is to check the quality of the work of others.

A) True
B) False

Correct Answer

verifed

verified

Showing 61 - 80 of 87

Related Exams